Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Powerhouse #8 - View of Dam 5



You might also be interested in

  • Powerhouse 8

    Powerhouse 8

    Visual Materials

    Powerhouse 8 - Framework construction

    photCL SCE 02 - 06865

  • Powerhouse 8

    Powerhouse 8

    Visual Materials

    Powerhouse 8 - Framework construction on

    photCL SCE 02 - 06860

  • Powerhouse 8

    Powerhouse 8

    Visual Materials

    Powerhouse 8 - Framework construction with Steam shovel excavating along side the framing.

    photCL SCE 02 - 06861

  • Powerhouse 8

    Powerhouse 8

    Visual Materials

    Powerhouse 8 - Framework construction with Steam shovel excavating along side the framing.

    photCL SCE 02 - 06862

  • Powerhouse #8

    Powerhouse #8

    Visual Materials

    Powerhouse #8 - Forms going up for Dam 5

    photCL SCE 02 - 06750

  • Image not available

    Big Creek: Dams

    Visual Materials

    Photographs of Dams 1, 2, 3, 3A, 5 and 6 including Dam 1 intake tower (interior and exterior), seepage, sluice pipes, spilling over top and through spillways, automatic siphons; Dam 2 - watchman's house; Dam 3 and 3A; Dam 4 spilling; Dam 5 - site excavation, forms up, diversion flume, dam construction, trash rack, sluicing mud banks, Powerhouse 8 forebay construction; Dam 6 - site excavation, construction, coffer dam, diversion, framework, primary rock crusher No. 9, Tunnel 3 intake, Dam 6 spilling.

    photCL SCE