Visual Materials
Location for Outdoor Substation at the back of Powerhouse #1
You might also be interested in
Image not available
Mobile substation (distribution) for emergency back
Visual Materials
[Mobile substation (distribution) for emergency back-up] [with 1 variant]
photCL SCE 06 - 72417

The back of the switchboard at Exeter Substation
Visual Materials
The back of the switchboard at Exeter Substation.
photCL SCE 04 - 00665

A close view of the outdoor apparatus at Tipton Substation
Visual Materials
A close view of the outdoor apparatus at Tipton Substation.
photCL SCE 04 - 00593

Substations and Powerhouses
Visual Materials
Lindsay Substation; Delano Substation; Visalia Steam Plant; Kaweah #1 - flume, cottages, powerhouse, switchboard; Kaweah #2 Powerhouse, Kaweah #3 - construction of flumes, tunnels, canals, diversion dam & intake, regulating reservoir/forebay, canal repairs, sandbox, steel pipeline, siphon, penstock, incline RR, Powerhouse 3 ; Wolverton; Visalia Garage; Tulare Substation & Waterworks; const. MWP Co. General Office in Visalia; Tule diversion dam & Intake, Marble Fork Camp, construction of Tule flumes, canals, forebay, and Tule Powerhouse.
photCL SCE 13 - vol 114

Santa Barbara Substation - Outdoor Rack
Visual Materials
Santa Barbara Substation - Outdoor Rack - rear
photCL SCE 02 - 09660

Santa Barbara Substation - Outdoor Rack
Visual Materials
Santa Barbara Substation - Outdoor Rack - front
photCL SCE 02 - 09662