Visual Materials
Big Creek Powerhouse 2a
You might also be interested in

Big Creek - Powerhouse #2 & 2a (part 3)
Visual Materials
Big Creek - Powerhouse #2 & 2a (part 3) [Construction at Powerhouse 2A, manufacturing photos showing the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at PH 2A.]
photCL SCE 13 - vol 031

Powerhouse 2a
Visual Materials
Powerhouse 2a - Looking downstream at Powerhouse #2, showing the structural steel work of PH #2A.
photCL SCE 02 - 14734
Image not available
Big Creek: Powerhouse No. 2 and 2a (part 3)
Visual Materials
Photographs of Powerhouse 2 and 2A, Part Three. Construction at Powerhouse 2A, images depicting the fabrication of seamless steel pressure pipe [penstock] sections, forging hollow steel blocks into pipe, machining seamless steel pipe sections to proper thickness, pressure testing pipe sections, assembly of penstock sections and valves at Powerhouse 2A.
photCL SCE

Big Creek PH 2A
Visual Materials
Big Creek PH 2A - "Y" branch penstock section for Pelton leg.
photCL SCE 02 - 22935

Big Creek - Powerhouse #2, & 2a - maintenance
Visual Materials
Big Creek - Powerhouse #2, & 2a - maintenance [Exterior shots of PH #2, full shot of PH 2 & 2A, generator floor in PH 2, Unit 6 bucket failure (PH2) with close-ups of damage, damage to overhead crane from flying #10 bucket, PH 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gatehouse, penstock "Y"s, rotor installation, PH2 Unit 3 winding failure, broken buckets]
photCL SCE 13 - vol 044