Visual Materials
Pouring concrete in 12" bearing wall (east) forms above wye
You might also be interested in

View of east 42" pipe in place at upper end and forms for bearing walls center and west lines above wye
Visual Materials
View of east 42" pipe in place at upper end and forms for bearing walls center and west lines above wye.
photCL SCE 02 - 20139

View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall
Visual Materials
View of excavation for 42" sluice pipe upper end after concrete foundation was poured up to base of 12" bearing wall.
photCL SCE 02 - 20145

Preparing forms for pouring the concrete of the Nevada-side "stony gate"
Visual Materials
Preparing forms for pouring the concrete of the Nevada-side "stony gate". Pg. 188.
photCL SCE 11 - 00372

Portal Powerhouse
Visual Materials
Portal Powerhouse - Placing concrete in supporting wall under end of 12' diameter pipe. Excavating old concrete anchor. [Forming new] foundation & Wye branch anchor.
photCL SCE 02 - 43529
Image not available
Long Beach Steam Plant No. 2
Visual Materials
Building foundations for new units, pouring concrete in foundation forms from tower, pouring concrete for additional unit in Plant No. 1, installing fourth boiler bank in Plant No. 1, Plant 2 machine shop, discharge tunnel, steel framework going up, first aid station, and concrete being poured into wall forms.
photCL SCE

Kern River No. 1 - Concrete retaining wall and guniteed rock wall
Visual Materials
Kern River No. 1 - Concrete retaining wall and guniteed rock wall - flood damage repair
photCL SCE 02 - 30555