Visual Materials
Boulder-Chino Transmission Line (2nd)
You might also be interested in

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Tensioning Conductor at M91-T2.
photCL SCE 02 - 23267

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Installing bird guards at M113-T1
photCL SCE 02 - 23270

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - View of Camp 5 at M157-T1
photCL SCE 02 - 23272

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Pulling out conductor with winch tractor at M201-T3.
photCL SCE 02 - 23544

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Making up conductor dead-end connection.
photCL SCE 02 - 23550

Boulder-Chino Transmission Line (2nd)
Visual Materials
Boulder-Chino Transmission Line (2nd) - Guard Poles for pulling cables over A.T.&S.F. Railroad near M220-T1. [A steam locomotive is switching track between the guard poles].
photCL SCE 02 - 23545