Visual Materials
Powerhouse 2 & 2A
You might also be interested in

Mammoth Pool Powerhouse
Visual Materials
Mammoth Pool Powerhouse - during penstock installation [color trans., with 1 variant]
photCL SCE 08 - 00370
Image not available
Big Creek Powerhouse No. 2 and 2A, Maintenance
Visual Materials
Exterior shots of Powerhouse No. 2, full shot of Powerhouse 2 and 2A, generator floor in Powerhouse 2, Unit 6 bucket failure (Powerhouse 2) with close-ups of damage, damage to overhead crane from flying No. 10 bucket, Powerhouse 2-2A switch rack, Dam 5 intake trash rack cleaner, water rheostat test, transporting 220kV transformers, gate house, penstock "Y"s, rotor installation, Powerhouse 2.
photCL SCE

Powerhouse 2 & 2A
Visual Materials
Powerhouse 2 & 2A - Switchyard excavation.
photCL SCE 02 - 28336

Powerhouse 2 & 2A
Visual Materials
Powerhouse 2 & 2A - Switchyard excavation progress.
photCL SCE 02 - 28345

Powerhouse 2 & 2A
Visual Materials
Powerhouse 2 & 2A - Grading for switchyard.
photCL SCE 02 - 28350

Powerhouse 2 & 2A
Visual Materials
Powerhouse 2 & 2A - Excavating upper part of Big Creek #2 Switchyard.
photCL SCE 02 - 28346