Big Creek - Powerhouse #3 (part 1)
You might also be interested in
Image not available
Big Creek: Powerhouse No. 3 (part 1)
Visual Materials
Photographs of Powerhouse No. 3, Part 1. Construction photographs of first forms up on powerhouse, staging and concrete plant, Switching Station, powerhouse steel framework, generator floor, draft tube construction, incline, views from above, penstock construction, Tunnel 3, CO2 equipment on Unit 3, Penstock binding, dispatcher's building, manifold assembly, oil circuit breakers, transformers, Dam 6 spilling, completed Powerhouse 3.
photCL SCE

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Staging and concrete plant, PH 3, showing combination track layout. [View of Powerhouse, and part of penstock ditch during early form construction]
photCL SCE 02 - 08530

Big Creek - Powerhouse #8 (part 2)
Visual Materials
Big Creek - Powerhouse #8 (part 2) [Powerhouse #8 - Diversion, excavation for powerhouse, diversion tunnel construction, interior shots of PH #8 (transformers, control room, turbine-generator assembly, station power, Johnson Valve, turbine runner, crane assembly, scroll case assembly, draft tube); Penstock rupture - ripped Penstock, flattened pipe, damage to powerhouse and other facilities, reshaping pipe, adding reinforcing bands to high stress sections of penstock; Camp 33, operator dormitory, substation, incline construction.]
photCL SCE 13 - vol 035

Big Creek - Powerhouse #2 & 2a (part 2)
Visual Materials
Big Creek - Powerhouse #2 & 2a (part 2) [Powerhouse 2 & 2A - auto transformers, substation, new 6.6kV line, new bridge for powerhouse extension, Unit #4 with direct connected exciter, constructing new Unit #4, 150kV - 220kV Bushings, switchboard, installation of new Unit #4 penstock, concrete plant, incline batch cars, stand pipes, Unit #3 foundation, Unit #3 penstock install, valve house modification, rock crushing plant, Johnson Valve, assembly of new Unit #3, auto circuit breakers, 150kV Oil Switch, new hoist, auto-transformers, and 11kV equipment, new Bus Bar installation, Governor #4; Camp #7 - telephone exchange, cottage, machine shop, warehouse, mess hall construction, sawmill; Camp #5 - forebay construction, batch plant, steam shovel excavating.]
photCL SCE 13 - vol 030

Big Creek Powerhouse #3 - Unit 4 - Penstock construction
Visual Materials
Big Creek Powerhouse #3 - Unit 4 - Penstock construction - Butterfly valve near manifold.
photCL SCE 02 - 28277

Big Creek Powerhouse #3
Visual Materials
Big Creek Powerhouse #3 - Penstock #3 Manifold Sphere #2 made up.
photCL SCE 02 - 09108