Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

Long Beach Steam Station No. 3


You might also be interested in

  • Image not available

    Long Beach Steam Station No. 3

    Visual Materials

    Long Beach Steam Station No. 3 construction, including superheater, header, boiler assembly, skylight over Turbo Room, flue opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE

  • Image not available

    Long Beach Steam Station

    Visual Materials

    Long Beach Steam Station - Plant 3 construction photos, superheater, header, boiler assembly, skylight over Turbo Room, flu opening, stacks, view of all 3 plants, installing 83 ton transformers, Turbine Room interior, circulating water pumps, condenser installation, boiler interior, aerials of station, concrete girder reinforcement, exciter, oil switches, switch garden, control house, screen wells.

    photCL SCE 13 - vol 094

  • Long Beach Steam Station, Plant #3

    Long Beach Steam Station, Plant #3

    Visual Materials

    Long Beach Steam Station, Plant #3 - Installing Oil Switches.

    photCL SCE 02 - 15526

  • Image not available

    Long Beach Steam Plant No. 1

    Visual Materials

    Construction and operation of Long Beach Steam Plant No. 1: boiler installation, pile driving, train derailment at steam station, specimens of marine growth from intake tunnel, overviews of Steam Station, extension of Plant No. 1, dismantling old Long Beach Gas Plant, foundation work for Unit No. 2.

    photCL SCE

  • Image not available

    Long Beach Steam Station No. 2 and No. 3

    Visual Materials

    Condenser installation, stacks, south elevation poured, turbo installations, turbo room construction, boiler room construction, bricking the boilers, exterior shot complete with 8 stacks on Plant 2, control room. Piles placed for Plant 3 construction, moving above ground fuel storage tank by floating.

    photCL SCE

  • Image not available

    Long Beach Steam Plant No. 2

    Visual Materials

    Building foundations for new units, pouring concrete in foundation forms from tower, pouring concrete for additional unit in Plant No. 1, installing fourth boiler bank in Plant No. 1, Plant 2 machine shop, discharge tunnel, steel framework going up, first aid station, and concrete being poured into wall forms.

    photCL SCE