F.P.C. Vol. 4, Projects 67 & 120

1 of 136


You might also be interested in

  • Image not available

    F.P.C. Vol. 4, Projects 67 and 120

    Visual Materials

    Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.

    photCL SCE

  • Image not available

    F.P.C. Vol. 4, Projects 67 and 120 (copy 2)

    Visual Materials

    Duplicate of F.P.C. Vol. 4 but missing several pages.

    photCL SCE

  • Image not available

    F.P.C. Projects 67 and 120, Volume 3 (copy 2)

    Visual Materials

    Duplicate of F.P.C. Projects 67 and 120, Volume 3 (Box 9).

    photCL SCE

  • Image not available

    F.P.C. Vol. 1, Projects 67 and 120 - Construction of Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion

    Visual Materials

    Florence Reservoir, Florence Tunnel, and Mono-Bear. Views include Big Creek Canyon; Florence Lake Dam site, including diamond drilling, clearing site, crib dam; Florence Lake Dam construction, forms construction; Florence Tunnel intake, tunnel excavation; Mono Dam construction: Mono-Bear junction; Mono-Bear siphon construction.

    photCL SCE

  • California Electric Power Corp. - Hydro Project photos of Ben Johansen, Southern Sierras Power Co

    California Electric Power Corp. - Hydro Project photos of Ben Johansen, Southern Sierras Power Co

    Visual Materials

    California Electric Power Corp. - Hydro Project photos of Ben Johansen, Southern Sierras Power Co. - Hauling equipment for Powerhouse, trucks hauling power poles, Silver Lake Power line, Agnew Dam & reservoir, Silver Lake Plant, pipe for Owens River Plant, site before PH #1 was built, PH #1 construction,

    photCL SCE 13 - vol 126

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE