Skip to content

OPEN TODAY: 10 A.M.–5 P.M.

Tickets

Visual Materials

F.P.C. Vol. 1, Projects 67 and 120 - Construction of Florence Lake Dam, Florence Tunnel, & Mono-Bear Diversion


You might also be interested in

  • Image not available

    F.P.C. Vol. 4, Projects 67 and 120

    Visual Materials

    Transportation, Vincent Transmission Line, and Stream gaging. San Joaquin and Eastern Railroad; Incline railroads at Big Creek Powerhouse No. 2, Powerhouse No. 3, and Powerhouse No. 8, Project 3 road construction in San Joaquin Canyon; winter transportation service, road construction for Florence Lake and Tunnel project; Trucks at Mono-Bear siphon; Vincent Transmission Line construction; Stream gauging; Mammoth Pool dam site; Westside projects, Powerhouse 8 Transmission Line; Views of Big Creek general office, machine shop, and radio room; Huntington Lake; Big Creek Powerhouse No. 1 and penstocks; Boylston Street drafting room during the peak of Big Creek construction; Eagle-Bell transmission line; Long Beach Steam Station.

    photCL SCE

  • F.P.C. Vol. 4, Projects 67 & 120

    F.P.C. Vol. 4, Projects 67 & 120

    Visual Materials

    F.P.C. Vol. 4, Projects 67 & 120 - [Transportation - SJ&E RR near Auberry, incline railroads at PH #2, PH #3, & PH #8, Project 3 road construction, winter transportation, roads to Florence Lake and Tunnel project, trucks at Mono-Bear Siphon; Vincent Transmission Line construction; Stream gauging, Mammoth Pool dam site, Westside projects, PH8 Transmission Line; Big Creek - General Office, Machine Shop, Radio Room, Huntington Lake, Powerhouse 1, Boyleston Engineering office, Eagle Bell T/L, Lighthipe Substation, Long Beach Steam Station.]

    photCL SCE 13 - vol 010

  • Image not available

    Big Creek: Mono-Bear and Huntington-Shaver Diversions

    Visual Materials

    Views of Bear Dam, Mono Dam, Mono-Bear pipelines and diversions, and Huntington -Shaver diversions. Construction of Bear Creek Dam and intake structure, and Mono Creek Dam and intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear siphon, backfilled siphon and pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek siphon, duplex valve on Huntington-Pitman-Shaver conduit and tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.

    photCL SCE

  • Image not available

    Big Creek construction

    Visual Materials

    Big Creek, including tunnel excavation, Bear Dam, Mono Dam, Mono-Bear siphon construction; Florence Lake Dam construction, Ward Tunnel spilling; Shaver Lake Dam construction, concrete mixing plant, first concrete, screening plant, Quarry, Powerhouse 2A construction, Stevenson Test Dam construction; Gauging San Joaquin River, Herminghaus Ranch.

    photCL SCE

  • Big Creek - Mono-Bear and Huntington-Shaver diversions

    Big Creek - Mono-Bear and Huntington-Shaver diversions

    Visual Materials

    Big Creek - Mono-Bear and Huntington-Shaver diversions [Construction of Bear Creek Dam & intake structure, and Mono Creek Dam & intake structure, logging area for Mono Creek reservoir, pipeline crossing south fork of San Joaquin River, Camps 71, 72, 73, 80, 81, 82, 83, and 85; Mono-Bear Siphon, back-filled siphon & pipeline, tunnels, pipeline installations, outlets of Mono and Bear Tunnels, intake of Bear Tunnel at Camp 86, Intake of Mono tunnel, Big Creek Siphon, duplex valve on Huntington-Pitman-Shaver conduit & tunnel, intake for conduit at Dam 2, Warehouse, Mess hall and Hospital at Camp 73.]

    photCL SCE 13 - vol 038

  • Image not available

    F.P.C. Vol. 3, Projects 67 and 120 - Construction of Big Creek Powerhouse 3 and construction camps

    Visual Materials

    Construction of Powerhouse 3 and construction camps 1 to 54. Views include Tunnel 3, including intake construction, portal adit Camp 36, Camp 35 adit, outlet portal; Penstock 3 portal structure and manifold, surge chamber, drill sharpeners, connecting 18' penstock to manifold, butterfly valve house, flume to railroad sluicing water at outlet; Tunnel 3 excavation; Surge chamber construction; Construction views of Powerhouse 3, installation of 3 penstocks, turbine and generator installations at No. 3; Construction of 220kV switchyard.

    photCL SCE